One of the parts of the current improvement project on the reserve is the digging of a new dipping pond behind the Education Centre. You may ask why we need a new one when we already have one. The answer is the old one has a leak and needs repair, but to do this it needs draining and so will mean we would have no pond for dipping for perhaps a year.
The new pond will allow us to effect the repair and eventually to have two ponds, which will mean that neither gets too disturbed as we will be able to spread the dipping activity between them. Below are a series of shots showing the pond developing up to today, when it is about half full of water thanks to a bit of much needed rain.
This project is funded by the Veolia Environmental Trust.